![]() Such statements can be identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of the company, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Further information about i-80 Gold's portfolio of assets and long-term growth strategy is available at or by email at statements in this release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable securities laws, including but not limited to, the expansion or mineral resources at McCoy-Cove and the potential of the Cove project. i-80 Gold's common shares are listed on the TSX and the NYSE American under the trading symbol IAU:TSX and IAUX:NYSE. ![]() is a Nevada-focused, mining company with a goal of achieving mid-tier gold producer status through the development of multiple deposits within the Company's advanced-stage property portfolio with processing at i-80's centralized milling facilities. In addition to the underground drill program, the exploration and development program will also include the completion of the first phase of the underground decline and drift, and detailed hydrological and metallurgical test work in advance of completing a Feasibility Study following the underground definition drill program. "With the Phase 1 underground decline nearing completion, the focus will shift entirely to the drill program, permitting and final mine approvals."Ĭove is one of three projects currently being advanced to realize the Company's goal of becoming the second largest gold producer in Nevada. "Grades and widths continue to meet or exceed expectations and are consistently at or above the current resource grade.", stated Tyler Hill, Chief Geologist of i-80 Gold. ![]() This program is focused on the CSD/Gap and Helen Zone portions (Figures 1 & 2) of the deposit which also includes mineralization below the pit in the Cove South Deep and 2201 deposits that are not being drilled as part of this program. The ongoing program, expected to consist of approximately 40,000 metres of drilling, is being completed on 30 metre spacing in advance of an updated resource estimate and economic study related to the construction of mining operation at McCoy-Cove. Highlight results from recent 2023 drilling at Cove include: ![]() The new results include the best intercepts to date and continue to demonstrate continuity of high-grade mineralization in the CSD/Gap Zone. (TSX: IAU) (NYSE: IAUX) ("i-80", or the "Company") is pleased to announce positive results from two additional underground drill holes at the Company's 100%?owned McCoy-Cove Property ("Cove" or "the Property") located in Lander County, Nevada. Results Include 18.9 g/t Gold 29.3 m and 14.9 g/t Gold over 32.7 m and 15.7 g/t Au over 22.5 m ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |